Topography - Architecture Registration Exam Webinar A.R.E. Site Planning & Design Exam Review
1,957 views · Published 27 March 2015 · 2:47 · Indexed 6 November 2026
Channel: Black Spectacles · 2015 · Education
To learn more about the Site Planning & Design Exam, visit http://blackspectacles.com/courses/are-prep-site-planning-and-design/ So we're going to move on to the next page here. When we talk about that, that sounds funny. Like, what do I mean by 2% is the minimum slope? You can't have flat? Like, why not? Well, it turns out you actually can't have flat. All those times when we draw up something flat on the exterior, it's wrong. There is never anything flat. The reason for that is water has to go somewhere and we want to tell it where to go. You don't want to just let the water figure out where it's going to go, you want to tell it where it's going to go. There are a couple of exceptions. You're using permeable concrete or something like that. You deal with flats and then the water will actually permeate straight through. There's a few minimal exceptions, but generally, you always are sloping the land somewhere. So you want to make sure that it's going to the place that you mean for it to go. What they're saying on the exam, typically, - they can use a different number - the minimum it can be is a 2% slope. Otherwise, what you're going to get is ponding and it's going to create all kinds of problems. So if you think about 2% slope, how far apart are the contour lines? Any guesses? The answer is going to be 50 feet apart. Because 50 feet apart with a one foot contour, one to 50 is going to be the same as 2 to 100, which would be 2%. If that would be something that would show up, you'll want to check to make sure that you don't have contour lines that are farther apart than 50 feet because that would be too low a slope and water will pond. Twenty percent is often the maximum that you're allowed to have for certain kinds of landscaping, or for people to be able to wander up and down easily. If you start getting over 20%, people start tripping. Fifty percent slope is often the maximum for stopping erosion and some other issues like that. So you'll see a few of these numbers over and over again, and you should just get used to how you use them.
More from this channel
-
4:13
3Axis Digital Fabrication | Kansas City | Black Spectacles
-
2:08
Speculations on Design Technology with Erin Rae Hoffer & Scott Simpson | Black Spectacles
-
3:22
David Fano and Steve Sanderson of Design By Many | Black Spectacles Interview
-
1:50
The Un-Competition Project | Black Spectacles
-
0:35
Revit Tutorial: Introduction to Curtain Wall Families in Revit Architecture | Black Spectacles
-
2:53
Revit Tutorial: Types of Curtain Walls | Black Spectacles
-
9:55
Revit Tutorial: Building a Stick Curtain Wall | Black Spectacles
-
0:36
Revit Tutorial: Introduction to Door Families in Revit Architecture | Black Spectacles