Topography - Architecture Registration Exam Webinar A.R.E. Site Planning & Design Exam Review

1,957 views · Published 27 March 2015 · 2:47 · Indexed 6 November 2026

Channel: Black Spectacles · 2015 · Education

Watch on YouTube

To learn more about the Site Planning & Design Exam, visit
http://blackspectacles.com/courses/are-prep-site-planning-and-design/

So we're going to move on to the next page here. When we talk about that, that sounds funny. Like, what do I mean by 2% is the minimum slope? You can't have flat? Like, why not? Well, it turns out you actually can't have flat. All those times when we draw up something flat on the exterior, it's wrong. There is never anything flat. The reason for that is water has to go somewhere and we want to tell it where to go. You don't want to just let the water figure out where it's going to go, you want to tell it where it's going to go. There are a couple of exceptions. You're using permeable concrete or something like that. You deal with flats and then the water will actually permeate straight through. There's a few minimal exceptions, but generally, you always are sloping the land somewhere. So you want to make sure that it's going to the place that you mean for it to go. 
What they're saying on the exam, typically, - they can use a different number - the minimum it can be is a 2% slope. Otherwise, what you're going to get is ponding and it's going to create all kinds of problems. So if you think about 2% slope, how far apart are the contour lines? Any guesses? The answer is going to be 50 feet apart. Because 50 feet apart with a one foot contour, one to 50 is going to be the same as 2 to 100, which would be 2%. If that would be something that would show up, you'll want to check to make sure that you don't have contour lines that are farther apart than 50 feet because that would be too low a slope and water will pond. Twenty percent is often the maximum that you're allowed to have for certain kinds of landscaping, or for people to be able to wander up and down easily. If you start getting over 20%, people start tripping. Fifty percent slope is often the maximum for stopping erosion and some other issues like that. So you'll see a few of these numbers over and over again, and you should just get used to how you use them.

More from this channel