[IRI] Off-link | Himgiri Superfast Accelerating towards Varanasi with Offlink AJNI ( NAGPUR ) WAP7

1,060 views · Published 16 April 2017 · 1:55 · Indexed 29 October 2026

Channel: Mohd Arif · 2017 · Travel & Events

Watch on YouTube

Right on-time  12332 Jammu Tawi -  Howrah Himgiri SF Express ( حیمگیری ایکسپریس / हिमगिरि एक्सप्रेस ) With big off-link  Ajni Shed WAP7 #30849 Loco Accelerating towards its next halt Jaunpur Station , we captured this train near Sultanpur Junction 

Some info about Howrah Station :-

    Howrah Junction railway station (station code HWH) is the largest railway complex in India with maximum number of platforms in the entire railway system of India, 23 platforms. It is one of the four intercity railway stations serving the city of Kolkata, the others being Sealdah Station, Santragachhi Station and Kolkata railway station. The terminal station is located on the west bank of the Hooghly River, linked to Kolkata by Howrah Bridge. With 23 platforms, it has the highest train-handling capacity of any railway station in India; and is top ranked first busiest railway stations in terms of passenger volume per day.

    Total 293 passenger trains Start/End/PassThrough Howrah railway station.  Total 1220 Stations are directly connected to Howrah railway station via these 293 passenger trains

    Initial plans for the first Howrah railway station were submitted by George Turnbull the Chief Engineer of the East Indian Railway Company on 17 June 1851. In January 1852, it became clear that the government authorities would not sanction the purchase of sufficient land nor the necessary waterfrontage despite remonstrations from Turnbull that the terminus would grow enormously. In May 1852, the detailed station plans were the major work of him and his team of engineers. In October four tenders for building the station were received varying from 190,000 to 274,526 INR against an estimate of 250,000 INR. 

    Due to a great increase of traffic, a new station building was proposed in 1901. The new station was designed by the British architect Halsey Ricardo. It was brought into service on 1 December 1905.  This building is the current Howrah station building. The station had 15 platform tracks.

   It was expanded in the 1980s with the addition of 8 platform tracks in an area to the south of the station which previously had a parcels terminal, bringing the track count up to 23. At the same time a new Yatri Niwas (transit passenger facility) was built south of the original head house.

    There are currently 23 platforms in Howrah Station. Platforms 1-15 are located in the old complex also referred to as Terminal-1, while 17-23 are in the new complex (Terminal-2). Terminal-1 serves the local and long-distance trains of Eastern Railway as well as local trains of South Eastern Railway. Terminal-2 serves the long distance trains of South Eastern Railway

    The station is served by the Eastern Railway for local trains to Belur Math, Tarakeswar, Arambagh, goghat, Katwa, Bandel, Sheoraphuli, Bardhaman, Serampore and numerous intermediate stations (see Main Line, Chord and Tarakeswar branch line); and mail/express trains to Central, North and North-East India. A narrow gauge line connects Bardhaman and Katwa and is currently served by DMU trains (all other lines run EMU trains). There is a plan to extend the suburban train service from Bardhaman to Mankar and Guskara, by electrifying the Khana–Guskara existing stretch, which is currently served by diesel loco hauled trains. The Bardhaman–Mankar stretch is now served by electric loco hauled trains.

    The South Eastern Railway serves local trains to Amta, Mecheda, Panskura, Haldia, Tamluk, Haldia, Kanthi, Medinipur and Kharagpur; and mail/express trains to Central, West and South India. The Tamluk–Kanthi stretch is currently electrified and now EMU runs up to Digha. There is a plan to extend the suburban train service from Kharagpur to Jhargram, Hijli, Belda and Narayangarh. Both stretches are now served by electric loco (EMU) hauled trains.

    The station is served by the Eastern Railway for local trains to Belur Math, Tarakeswar, Arambagh, goghat, Katwa, Bandel, Sheoraphuli, Bardhaman, Serampore and numerous intermediate stations (see Main Line, Chord and Tarakeswar branch line); and mail/express trains to Central, North and North-East India. A narrow gauge line connects Bardhaman and Katwa and is currently served by DMU trains (all other lines run EMU trains). There is a plan to extend the suburban train service from Bardhaman to Mankar and Guskara, by electrifying the Khana–Guskara existing stretch, which is currently served by diesel loco hauled trains. The Bardhaman–Mankar stretch is now served by electric loco hauled trains.

More from this channel