TS2015 HD: MBTA Providence Line Train 813 Cab Ride from Boston South Station to Wickford Junction

2,188 views · Published 17 December 2014 · 1:37:42 · Indexed 20 September 2026

Channel: Fan Railer · 2014 · Gaming

Watch on YouTube

EDIT: Comprehensive physics & sound mod: http://www.youtube.com/watch?v=vQJ_EhWAz0Y

Due to the cancellation of train 917, we are making two additional stops at Route 128 and Canton Junction. You can view the schedule here: http://www.mbta.com/uploadedfiles/Documents/Schedules_and_Maps/Commuter_Rail/providence.pdf

Since MBTA equipment does not yet exist for TS2015, I am using the P32AC-DM and Shoreliner equipment instead. Note that I have substituted in HSP46 physics into the P32AC-DM for the MBTA runs.The train in use here consists of 9 cars being hauled by one locomotive. Enjoy and stay tuned =)

Parameters used for HSP46 physics (outdated; needs to be updated)::
MPI/GE HSP46 (GE GEVO-12; 4650 THP)
 a. Starting tractive effort of 72,000 lbs (320 kN) up to 22.02455 mph
 b. Dynamic Brake effort of 35,210 lbs (156.62 kN) from 50 mph down to 5 mph
 c. Wheel horsepower of 4,221 hp (3,150 kW); assuming 320 kW HEP load
 d. Increased weight of 131.543 metric tons (290,000 lbs)
 e. Fuel tank capacity of 1,800-2000 gallons
 f. Max traction amps = 720 (72000 lbs)
 g. Max braking amps = 352.1 (35210 lbs)
 h. Maximum speed of 110 mph (80 MPH on MBTA)

You can find out more about the New Haven - Boston NEC Route here: http://steamcommunity.com/sharedfiles/filedetails/?id=330377563

More from this channel