112. Overtaking the King and Crossing the Queen of South Central Railways- Bangalore Rajdhani
2,759 views · Published 29 July 2014 · 1:15 · Indexed 1 November 2026
Channel: Adithya Vaidyanathan · 2014 · Travel & Events
Date: July 17, 2014 Locations: Sindi, Distt. Wardha, Maharashtra (overtaking AP); between Ghatkesar and Moula Ali, Secunderabad, Telangana (Crossing Godavari) Be it lack of the Midas touch, or just a bloody jammed door, plain and simple, my luck was cursed, when i was almost in time to capture the AP express overtake, and the door of my coach refused to open until the 7th coach of AP had passed, so in short i had captured only 1/3rd of the the rake, starting from S7. It was led by LGD WAP7 30271, whereas the capture of Godavari express turned out much better, it was my maiden capture and it was in between Ghatkesar and Moula Ali, led by LGD WAP4 22206, both are CBC rakes belonging to HYB divn of SCR. ------------------------------------------------------------ History:- The Godavari Express is one of the most prestigious trains of South Central Railway and runs between Visakhapatnam and Hyderabad. It was introduced as the Waltair-Hyderabad express on 1 February 1974 with the train numbers being 7007 and 7008. Its current train numbers are 12727 and 12728. The extremely high demand for this train, especially for the air-conditioned coaches of the train has resulted in the inauguration of a fully air-conditioned Garib Rath and the introduction of a Duronto. Despite the two new trains, the demand for the Godavari Express is so high, that sometimes an unreserved coach is replaced with an extra Classic Sleeper or Third Class coach. The train is considered the best way between the two cities and is maintained very neatly by the South Central Railway. Proposals on extension of this train up to Bhubaneshwar were strongly opposed by both passengers and politicians as earlier, another train, namely Visakha Express was extended to the city considerably increasing its journey time. The Godavari Express serves the purpose of connecting the cities of four coastal districts in Andhra Pradesh to the state capital Hyderabad. The train stops at four stations in the Visakhapatnam district, six stations in the East Godavari district, three stations in the West Godavari district and Vijayawada in the Krishna district. On 1 February 1974, the Indian Railways announced the first railway service between Visakhapatnam and Hyderabad, with the Waltair-Hyderabad Express. The train was run on a daily basis and would depart Visakhapatnam at 5:30 pm and arrive in Hyderabad at 6:45 am, the next morning. On the return journey, it would depart Hyderabad at 5:15 pm and arrive in Visakhapatnam at 6:45 am the next morning. As the train provides rail connectivity to at nine stations in the deserted cities of East and West Godavari districts, it was officially named Godavari Express. It was regularly hauled by a steam locomotive and had 17 coaches. It reached its highest speed of 50 km/h between Samalkot and Rajahmundry. A slip service was introduced in the train during 1975, and the train was run up to Kakinada. Five more coaches were added, as a result. The train also entered a Rake Sharing Agreement or RSA with the Simhadri Express which ran between Visakhapatnam and Rajahmundry. However, in 1980, both the slip service and the RSA were cancelled as the Simhadri Express was extended up to Bhimavaram and the Kakinada-Secunderabad Goutami Express was introduced. The train retained its 5 new coaches and ran with a diesel locomotive end to end. The train was re-numbered as 2727 and 2728. By 1990, the train had become very popular and two more coaches were introduced, taking the total to 24. It then became one of the longest trains in India. As the Visakhapatnam-Vijayawada line and the Vijayawada-Kazipet-Hyderabad lines were electrified, the train started running with the WAP 4 electric locomotive. Soon, the Godavari Express became the first train belonging to the South Central Railway to run with 5 air-conditioned coaches. In June 1999, the train met with its first incident, as it derailed at Ghanpur near Warangal. In the year 2000, the Godavari Express became the first train in the South Central railway to run with its own air conditioned first class coach and was also the first train in the Zone to have 6 air-conditioned coaches. As a result, the journey time was then reduced by 15 minutes in both directions and an additional stop was allotted at the Duvvada and Annaparti railway stations. ------------------------------------------------------------ Rake/Coach Composition: Godavari exp:- LOCO-SLRD-GS-GS-S1-S2-S3-S4-S5-S6-S7-S8-S9-S10-S11-S12-B1-B2-B3-A1-A2-H1-GS-GS-SLRD Indiarailinfo:- http://indiarailinfo.com/train/godavari-sf-express-12728-hyb-to-vskp/531/834/401
More from this channel
-
1:16
My first Video in Youtube - Fastest Bangalore Kolkata Train; 12246/Yeshvantpur Howrah Duronto Exp !!
-
0:40
Majestic White Stallion 6200hp LGD WAP7 with 12640/Brindavan Superfast Exp thrashes Whitefield @ MPS
-
0:43
Powerful HHP Locomotive WDP-4B hauls fastest Bangalore Mysuru Train - 12007/Shatabdi Superfast Exp!!
-
0:39
Sparkling Clean POH Rake of Mysuru Chennai Shatabdi Express smooth Acceleration with ED WAP-4 Loco!!
-
1:19
One For ALCo Lovers ! Volcanic Eruption & Rapid Acceleration by KJM WDM3A with Sparkling New Coaches
-
0:56
Twilight Blast; Erode WAP4 overcrowded Ernakulam Superfast Exp Stellar display of MPS at Whitefield.
-
0:57
Legendary Train of Chennai Line; ED WAP4 Brindavan Express Kicking dust & astounding Speed display!!
-
0:22
Extremely Rare Crossing - 3 Hrs Late Seshadri Exp rushes past Brindavan Exp at Windsor Manor Bridge.