Site Section and Topography - Site Planning Review - Architect Registration Exam A.R.E. Webinar
3,925 views · Published 16 March 2016 · 9:50 · Indexed 26 October 2026
Channel: Black Spectacles · 2016 · Education
ARE Prep powered by Black Spectacles- blackspectacles.com/courses Mike's Recommended Resources to pass the ARE: http://blackspectacles.com/blog/books-need-to-pass-are-exam-resources Let's do some quick topography. So as probably most of you know, there's a whole vignette on topography, and that vignette has essentially two things it's going to ask you to do. It's possible, they might ask you to do three things, but usually, it's just two. And the two that typically it will say, is it will say something like, All right, here we have a topographic plan, and we want you to make a flat area to be able to put a structure on." Well, the first thing to say is, there's no such thing as flat when you're talking about outside. Unless, it's a concrete slab. Everything else is sloping to some degree. So when they say flat, or flattish, or a pad, what they're referring to is something that's very low slope, that's going to make it easy to then build on. So first thing I would want to know is where is high and where is low. So I'd have to look at the numbers. When you look at something like this, you actually don't know which way is up and which way is down until you start seeing the numbers. So let's assume that up to the top is up for now. Let's say, that's a 95, and this is 94, and 93, etc. So first thing you notice is that what I've done here is immediately is I've called it out as a one foot interval. One foot is very typical, especially on the various vignettes. But it's possible it could be a two foot interval. If you were talking about maps and other complicated things, it could be a 5 foot, or 10 foot, 20 foot interval. If you're talking about something very, very small, it could be a one millimeter interval. The concept still works no matter what you're doing. But so the interval, that's definitely part of what's going on. You want to make sure you understand what the interval is and that it's continuous in which direction everything is going. Clearly, when I have the contour lines closer together, that's a steeper slope. When I have them farther apart from each other, that's a less steep slope. One of the ways that they're going to talk about slope is by using a percentage term. So if something says that there's a 20% slope maximum, then if it said, say 20% slope maximum, then you have to think about that as 20 feet vertical compared to 100 feet horizontal. So 20 feet vertical compared to 100 feet horizontal. Obviously that's the same as 2 to 10 or 1 to 5. But by using the percentage, it's a way of talking about slope. My least favorite way of talking about slope, but that's another story. So the two things that they're going to ask you to do in a place, a pad, which again is not a concrete pad. When they use the term "pad" in this context, it's going to be just a sort of flattish area that somebody could build on in the future. So where would I do it? Well, I could do it where it's very steep, but that seems silly. I'm probably going to try to choose an area that's already relatively flat, and then the second thing I'm going to want to do is I'm going to want to stop the water from just draining down, sheet draining down this hill into my structure, whatever that structure is. So I'm going to have to deal with that in some way, and I'm almost always going to do that with a swale. A swale is essentially a ditch, a berm is essentially a mound. So, in order to do this simply, I'm actually going to break them apart. So I'm going to do…the first one, I'm going to say let's make the flat area. So all right, well, one possibility is that I do something like I take this contour and maybe I cut it back. So I have a bunch of soil here that I've just removed by doing that, and you know, maybe I take that soil and I add it out over there. So I've taken the cut and I've put it in and used it as my fill. Cut and fill, balancing that. Something that absolutely will show up on the multiple choice. Absolutely will not show up in the terms of an idea on the vignette. You're still going to do cutting and filling, but nobody cares about whether any of it balances. So just make it easy on yourself. So what I've effectively done is I made this great big area here that is now reasonably flat. It's still sloping. It's still a one foot slope all the way across. But it's now a much bigger dimension. So it's comparatively flat. So that's sort of a nice simple big zone. So I can imagine that I could put a structure there relatively easily. And all I had to do was make this contour line push back and push out this second one here. Okay, I'm going to jump to the next screen and just do the same thing again but start talking about the swales. So you can see how that might work as well.
More from this channel
-
4:13
3Axis Digital Fabrication | Kansas City | Black Spectacles
-
2:08
Speculations on Design Technology with Erin Rae Hoffer & Scott Simpson | Black Spectacles
-
3:22
David Fano and Steve Sanderson of Design By Many | Black Spectacles Interview
-
1:50
The Un-Competition Project | Black Spectacles
-
0:35
Revit Tutorial: Introduction to Curtain Wall Families in Revit Architecture | Black Spectacles
-
2:53
Revit Tutorial: Types of Curtain Walls | Black Spectacles
-
9:55
Revit Tutorial: Building a Stick Curtain Wall | Black Spectacles
-
0:36
Revit Tutorial: Introduction to Door Families in Revit Architecture | Black Spectacles