how to debug&change moulds on capsule PVC Alu blister packing MC (English subtitle) 英文字幕詳解藥用泡罩機調節視頻
353 views · Published 7 September 2018 · 20:36 · Indexed 28 October 2026
Channel: Jack Du · 2018 · Science & Technology
Model YX-DPB250 PVC Aluminum film capsule blister packing machine 英文字幕詳解藥用泡罩機調節視頻 designed and manufactured by our engineer team in cosmetic&food&pharma making and packaging machinery is widely used in the daily chemical industry like blister packing machine and such like.We as a famous manufacturer moreover can design and produce the packaging machine according to the special requirements from customers. Basic specification of Tablet softgel capsule Aluminum foil PVC film forming filling sealing blister packaging machine food consumer products pharmaceuitcal equipment Item Model YX-DPB250 Cutting Frequency(ideal sizes:80*57mm) 15-45 cutting/min Max. Forming Area and Depth 70×110×26mm Adjustable Scope of Travel(mm) 30-140mm Packaging material(I.D.Φ75) PVC(mm) PTP(mm) (0.02-0.15)×350×(Φ400) Paper(mm) (50-100)gsm×350×(Φ400) Power 380V 50Hz 9.5kw Air compression(self-prepared) 0.6-0.8Mpa≥0.6m³/min Recycle water or circulating water consumption 60-100L/h Overall Dimension(L*W*H)(including foundation) 3650×850×1700 Dimension of Each Part 1850×850×1700(front) 1800×850×1650(back) Weight about 600kg How to change the mould for different size of product: Step 1.Before changing the new mould it is neccessary to check if the new mould is clean or there is foreign object. Press the manual key and set the mould to the bottom point.Pull out the forming air pipe and loose the ball nut. Remove the upper binder plate and forming mould.Take off the blinder plate from the upper forming mould,remove the upper forming mould; Loosen the lower blind flange,take out the lower forming mould. Lift the heat sealing cylinder and take down the thermocouple and power cable of heating plate. Loosen the uppler heating mould,remove the upper heating mould; Loosen the lower heating mould,remove the lower heating mould. Step 2.Loosen the ball bolt of indentation cover,pull out the cooling tubes,remove the cover and upper indentation mould; Loosen the binder plate of lower indentation mould,remove the lower indentation mould. Loosen the cover of upper indentation mould,remove the upper indentation mould. Step3.Screw off the ball nuts*4 in the blanking cover and fastening bolts*2; Dismantle the blanking cover; Remove the upper blanking mould. Screw off the fastening bolt of lower blanking mould,remove the lower blanking mould. Screw off the tightening screws of steel printer,remove the steel character holder. Loosen the bolt,take out the steel letter and put on the new letters and mantle them on the fixing plate. Step4.Aligned with the position box and load the new upper forming mould into the forming cover fixing the cover.Aligned with position box and load the new lower forming mould and fasten the binder plate. Put the binder plate on the forming mould and attach them with the disc spring washer&ball nut. Lift the machine to the upper point, Pre-load the ball nut and insert the air tube; Fasten the tightening nut after fix the ball nut in balance. Step5.Aligned with the position box and mount the lower heating mould,locking the binder plate; Aligned with the position box and mount the upper heating mould; Lock the binder plate and connect the thermocouple and power cable.Fix the ball nut in balance,adjust the pressure and lock the fastening nut. Step6.Aligned with position box and put the new upper indentation mould on the binder plate,lock the binder plate. Aligned with position box and put the new lower indentation mould on the binder plate,lock the binder plate.Mount the binder plate and upper indentation mould,Fix the ball nut in balance,adjust the pressure and lock the fastening nut.Connected with the cooling tubes.Install the new lower blanking mould,calibrate the position laterally. Lock the nut. Intall new lower blanking mould and the blanking binder plate.Screw on the ball nut balancedly and fix the upper mould bolt. Step6.Adjust the rails according to the size of new moulds. Firstly loosen all the fastening bolt.Pre-load them after rough caliberation because it requires the slight adjustment in the following operation.Lock the guide rail, So far the changing of mould is basically finished. Now start to debug the whole machine. Our Factory since 1992 has been manufacturing the cosmetic&food making and packaging machinery.In these field we have the experience rich enough to solve the questions encountered by our customers from both home and abroad.For more information about various high quality machinery like Model YX-DPB250 PVC Aluminum film capsule blister packing machine 英文字幕詳解藥用泡罩機調節視頻,please email via [email protected] or browse our website http://penglaichina.com. Watch us on Youtube:http://youtube.com/user/penglaichina Follow us on News Center:http://www.penglaichina.com/news/ Skype us by :turnanewleaf Call us via:0086-15811882441 Whatsapp:0086-15811882441
More from this channel
-
2:38
Evaporative swamp air coolers enviromental air conditioner home appliance cooling fan
-
1:23
operation instruction on the filling sealing machine for plastic tubes semi automatic filler&sealer
-
1:02
Cheap semi automatic soft tube filling and sealing machine наполнения и закрытия тюбиков машины
-
0:58
Verschließmaschine ultrasonic soft tube filling machine Siegelmaschine&チューブ充填機
-
1:39
horizontal pneumatic self-suction filling machine máquina de enchimento semi-automática
-
0:26
oil and water boiler for vacuum homogenizing emulsifier cream&lotion mixing vessels with homogenizer
-
0:38
tilting vacuum homogenizing emulsifiers operation video cream manufacturing machine vacuum mixer
-
1:10
Tea packing machine Paper bags filler sealer Automatike Verpackungsmaschine té máquina de embalaje