HVAC Training - How to write HVAC Memorandum Template in English / Hindi

681 views · Published 3 May 2018 · 10:17 · Indexed 6 November 2026

Channel: AfreenAli · 2018 · Education

Watch on YouTube

Site Memo No: 2004                                                                                                              Date:

Subject: AHU Fresh Air Intake – Not Ducted and No Protective Cover 

To: Contractor Company Name Projects

Attention:  Mr. (Project Director)

Specific Location: Level-2

Description:

● As shown AHU fresh air intake is not ducted and motorized damper is open without protective cover. Protective cover shall be provided to prevent the ingress of sand dust and other foreign materials.

• Sand trap louver should be provided in ducted fresh air intake opening. Sand trap louver shall comply as described in (Project Name) Mechanical Specs Div15/Section 15780-10 where it states that “Sand trap louvers for fresh air intake shall be heavy duty type. Channel frame and blade extruded aluminum of 3mm thick.” 

●Contractor to Confirm Corrective and Preventive Action Plans.
   
● Please see the attached pictures.
  

……………………………                                                                                         ..……………………….
Supervision Engineer                                                                                                    Snr. Project Manager
 

Engineers' Comments:- 
Closed 

Date:

THIS SITE MEMO IS AN INSTRUCTIONS, REQUEST OR REMINDER ISSUED AT THE WORK SITE FOR THE PURPOSE OF DEALING WITH ROUTINE MATTERS.
 
THIS MEMO SHALL HAVE NO FINANCAL EFFECT. IF THE CONTRACTOR BELIEVES TO THE CONTRARY, HE SHALL IMMEDIATELY ADVISE THE SNR. PROJECT MANAGER.


HVAC Training - How to write HVAC Memorandum Template in English / Hindi

More from this channel