CSX Q740 before departure
359 views · Published 10 August 2015 · 13:04 · Indexed 30 October 2026
Channel: TheN&WClassA1218 · 2015 · Entertainment
As I arrived, I saw that a cut of Tropicana reefers was sitting on the siding near the grade crossing. I figured that Q740's engines were going to run by the crossing, pick up the cars, and leave. Before that happened, there was some work going on with the engines. On the first clip, I noticed some Tropicana cars being shunted. Turns out that those pusher engines are the road power that will be leading today's juice train. It was off the distance, so I couldn't at first see them well. In the next clip, I finally saw headlights coming, so I was thinking it was the locomotives that were assigned to Q740. After seeing the cab lights, I thought "Alright! EMD leader!" I also was wondering if it would be an SD70MAC or an SD70ACe. After looking at the square shape on the nose, I figured it was an SD70ACe. And I was right! I've been catching a lot of CSX SD70ACes on the engineer's side (except for only 1 which was trailing), so I was glad to get one on the conductor's side! But I was planning to film on the conductor's side even if it wasn't an ACe. The power really took their time to make it from that end of the yard over to here. On the next clip, they get closer, where we can get a glimpse of the engines. They stopped right next to the reefers. Just then, the engines set off the crossing gates to go down, for no reason! They made it appear that they were going to run by the crossing, but nope! They stopped short. On the next clip, it's an idling shot of the power. Still wasn't that easy to get an idea of what they were doing. But later, a worker climbed into the cab of the SD70ACe. I got a shot of the engine with its cab door open. Later on, I got a shot of the guy climbing off the loco for something. I don't remember exactly what happened, but he might have been going to turn the switch straight so that the power could cross with no problem. I also saw the CSX pickup truck leaving, so that might have been something. Perhaps they were discussing their orders. In the next clip, the engines began moving by the crossing. That ACE had a really loud K5LLA! I mean loud! I also forgot my earplugs that day, so I got a feel of it. No big deal. They then stopped short of the crossing so that the conductor could get out and turn the switch after the locomotives pass the switch. After that was done, the power reversed into the siding to pick up the juice cars. Before attaching to the cars, they moved forward a tad a couple of times. I began wondering what the hell what they were doing. Like are they coupling or not? But after they got it done, I saw a man stepping off the GEVO and walking along the train. Before the trains can leave the railroad yards, the crews have to inspect the train to make sure everything is working properly. It's a safety procedure. Defect detectors aren't found all over the line. Plus if the train breaks and the juice gets ruined, that would suck. No fresh Tropicana to drink. Speaking of which, I heard a long time ago the exact reason why the juice train no longer carries containers. It always took a while to pick up the intermodals, which effected the time it took to deliver the juice. Tropicana was worried about that, because the juice needed to be delivered as soon as possible, otherwise it would spoil. Enjoy!!!! And stay tuned for the next video, as it has the juice train departing! :] 1. SD70ACE #4836 2. ES44AC #752
More from this channel
-
4:26
Police Chase City Trial Chicago
-
0:24
Amtrak Crescent #19 with P42s 85 and 155 arrives in Charlottesville
-
2:38
RARE! UP 1996 trails on NS 211!
-
2:51
6-27-12 NS intermodal through Port Clinton, OH
-
11:00
Ashland Train Day Part 2
-
0:19
Amtrak Silver Star with P42DC #23 and 154
-
0:05
Moving Christmas lights
-
0:13
Casino wrapped trolley pulls in Library station