The new LNER InterCity 225

4,397 views · Published 18 September 2018 · 1:37 · Indexed 20 September 2026

Channel: Trains Trains Trains · 2018 · People & Blogs

Watch on YouTube

Please follow me on social media 

Facebook:- https://www.facebook.com/TravelandTrainsAdventure
Twitter:- https://twitter.com/JudithSchooling 
Instagram: - https://www.instagram.com/judithschooling/



Please watch: "The abandoned Eurostar" 
https://www.youtube.com/watch?v=yq14YnFOewQ --~--
Service from Edinburgh Waverley to London Kings Cross on 16th September 2018

The InterCity 225 is an electric high speed train in the United Kingdom, comprising a Class 91 electric locomotive, nine Mark 4 coaches and a Driving Van Trailer (DVT). The Class 91 locomotives were built by British Rail Engineering Limited's Crewe Works as a spin-off from the Advanced Passenger Train project,[3][4] which was abandoned during the 1980s, whilst the coaches and DVT were constructed by Metro Cammell in Birmingham and Breda (under sub-contract) in Italy, again borrowing heavily from the Advanced Passenger Train. The trains were designed to operate at up to 140 mph (225 km/h) in regular service, but are limited to 125 mph (200 km/h) principally due to a lack of cab signalling and the limitations of the current overhead line equipment. They are used on services from London King's Cross to Newark North Gate, Doncaster, Leeds, Bradford Forster Square, Skipton, York, Newcastle, Edinburgh Waverley and Glasgow Central.