Whitt's Welding & Pipeline | Vermeer Underground Equipment
1,398 views · Published 28 February 2014 · 2:16 · Indexed 27 October 2026
Channel: Vermeer · 2014 · Science & Technology
"On a normal day 8 hour day we would, before drilling, with open cutting we would install about 300 to 350 feet (91.4 to 106.7 meters) of pipe a day, on average. With horizontal drilling we're able to do about 500 feet (152.4 meters) a day with less disturbance and just a lot cleaner job in general...It's great, we're able to get more done and do more kinds of work." -- Steve Whitt from Whitt's Welding & Pipeline Learn more about Vermeer horizontal directional drills: http://www2.vermeer.com/vermeer/NA/en/N/equipment/directional_drills_utility_installation.
More from this channel
-
3:09
More Waste in Less Space with the CT1010TX Compost Turner | Vermeer Recycling Equipment
-
2:38
T1255III Terrain Leveler Surface Excavation Machine in Bauxite
-
3:24
T1255III Terrain Leveler Surface Excavation Machine in Gypsum
-
0:58
How to market your geothermal loop installation business
-
2:27
Being Lean at Vermeer
-
2:03
Lean strategies for contractors and fleet owners
-
3:11
Preparing your brush chipper for winter use | Vermeer Tree Care Equipment
-
1:59
Faulkenburg Tree Experts | Vermeer Tree Care Equipment