Monster Looking WDG4D with Double Stack Containers || Chaos & Dusk Overtake - Indian Railways !!

483 views · Published 14 August 2017 · 1:46 · Indexed 27 October 2026

Channel: Anubhav Kashyap · 2017 · Autos & Vehicles

Watch on YouTube

Abu Road[ABR] WDG-4D with North Bound Double Stack Containers and Meanwhille Ranikhet Express bound to Kathgodam Arrives Pataudi Road and Overtakes the Tallest Freight Train of India!!


Hope you all like it!
Like, Comment, Share and....
Please Subscribe for Upcoming Video's!
 
|-----|
About Double Stack Containers: 
Double Stack Container Train rail transport is a form of inter-modal freight transport where inter-modal containers are stacked one above the other.With the container boxes stacked two-high, a double-stack train can potentially double the capacity in a Single train run. This effectively allows the company to move boxes outof the port area at a faster velocity in each train run, thereby easing congestion.INDIA'S FIRST double-stack train was flagged off by former Minister of Railways Laloo PrasadYadav on March 23 2006. Starting from the Kanakpura Inland Container Depot near Jaipur in Rajasthan, the train ran to the Arabian Sea port of Pipavav in Gujarat, a distance of 950 km. THE route was later extended up to Gurgaonin Haryana.Route followed by trains from NCR (Gurgaon) is Rewari ,Ringus, Phulera, Ajmer, Palanpur, Samakhiali, Gandhidham, Mundra Port and Pipavav Port.Train length is currently limited to 45 wagons by the length of passing loops, equivalent to 180TEUs. Maximum speed is 75 KPH. At present the service can only accepts 8ft 6in boxes.CONCOR : Container Corporation of India ltd.

Thanks for Watching!

©The RailStudio 2017

More from this channel