Indore AC Duronto breezing with WAP-4

1,171 views · Published 7 March 2012 · 0:20 · Indexed 22 September 2026

Channel: Amit Patel · 2012 · Travel & Events

Watch on YouTube

Vadodara (BRC) WAP-4E # 22769 with roof mounted DBRs hauling Mumbai bound 12228 Indore Mumbai Central AC Duronto Express. It was good to see Mumbai bound Indore Duronto running 30 minutes before time and on section MPS even though it was closely trailing Suryanagari Express. 

As of now this Bi-weekly train has 3 technical stops in its route. One of them is for loco change from Electric to Diesel. However, once Indore gets electrified then loc change will not be required. Actual arrival time for this train is 11:50 AM. However, most of the time I'm seeing this train running before time. So we can expect reduction in journey time for this train in new Time table. As of now this train takes 12 hours 50 minutes to cover distance of 828 Km with an average speed of 64.52 Km/ph.

My other video of this train with WCAM-2P can be see at

Inaugural run: http://www.youtube.com/watch?v=NB-Zyfo7YfY

With Miss-matching Rajdhani coach: http://www.youtube.com/watch?v=5jPSv7mXwME

Night capture of its MPS: http://www.youtube.com/watch?v=bgGpvXPuu80

Location: Umroli
Date & Time: 5-March-12 10:01 AM
Camera: Canon PowerShot SX30 IS

More from this channel