Installation of Steel Building

354 views · Published 18 February 2016 · 0:49 · Indexed 27 September 2026

Channel: Baofeng Hebei · 2016 · People & Blogs

Watch on YouTube

This video is about installation of steel foundation.Produce the foot cage in accordance with drawings.Specific methods are as follows.

a. Produce foot template according to foot bolt drawings.
b. Fix anchor bolts by the foot template, and then weld the iron slivers and anchor bolts and fix to each other.
c. Remove the foot template after fix anchor bolts. Such foot cage production is completed.

a. Slotted
b. Produce base foundation according to drawing. 
c. Fix the foot cage on base according to the anchor bolts drawing.
d. Pouring concrete.

The workers are do the foundation based on drawing and welding.

More from this channel