LHB 16516 KAWR - YPR Express Crossing 12224 ERS - LTT Duronto Express : Konkan Railways

1,185 views · Published 1 November 2018 · 0:31 · Indexed 12 November 2026

Channel: Chinmay Kole · 2018 · Travel & Events

Watch on YouTube

MONSOON KONKAN RAILWAYS DIESEL SINGLE LINE CROSSING : KJM WDM3A 14053 WITH LHB 16516 KARWAR - YESVANTPUR EXPRESS VIA KUNIGAL CROSSING 12224 ERNAKULAM - MUMBAI LTT AC DURONTO EXPRESS AT BARKUR STATION OF KONKAN RAILWAYS.

16516/Karwar - Yesvantpur Express (via Kunigal)
ಕಾರವಾರ - ಯಶವಂತಪುರ ಎಕ್ಸ್‌ಪ್ರೆಸ್ (ಕುಣಿಗಲ್ ಮಾರ್ಗ)     कारवार - यशवंतपुर (कुणिगल मार्ग)
KAWR/Karwar -- YPR/Yesvantpur Junction

12224/Ernakulam - Mumbai LTT AC Duronto Express
എറണാകുളം - മുംബൈ കുർള ശീതീകരിച്ച തുരന്തോ എക്സ്പ്രസ്സ്     एरणाकुलम - मुंबई एलटीटी वातानुकूलित दुरोंतो एक्सप्रेस
ERS/Ernakulam Junction (South) -- LTT/Lokmanya Tilak Terminus

The Yesvantpur - Karwar Express is an express train belonging to South Western Railway zone that runs between Yesvantpur Junction and Karwar in India. It is currently being operated with 16515/16516 train numbers on tri-weekly basis.
The 16515/Yesvantpur - Karwar Express has averages speed of 39 km/hr and covers 610 km in 15h 50m. The 16516/Karwar - Yesvantpur Express has averages speed of 41 km/hr and covers 610 km in 15h.
The important halts of the train are:
Yesvantpur Junction
Chikka Banavara
Kunigal
Hassan Junction
Sakleshpur
Subrahmanya Road
Mangalore Junction
Udupi
Mookambika Road Byndoor
Bhatkal
Kumta
Karwar.
The train has standard LHB rakes with a max speed of 160 kmph. The train consist of 14 coaches :
1 AC Chair Car
6 Second Sitting
5 General Unreserved
2 EOG Rake.
Both trains are hauled by a Krishnarajapuram Loco Shed based WDM 3A diesel locomotive from Yesvantpur to Karwar , Twin brakers are attached and detached between Sakleshpur and Subhramanya Road station and vice versa.
Train Reverses its direction 1 times:
Mangalore Junction.

The Ernakulam–Lokmanya Tilak Duronto is a bi-weekly nonstop superfast train between Kochi and Mumbai,[1] running through the scenic Konkan route. It is considered to be the fastest option for train connectivity between Kochi and Mumbai.
Mumbai LTT Ernakulam Ac Duronto Express(12223) departs from Mumbai Lokmanya Tilak Terminus Railway Station at 20:50.
Mumbai LTT Ernakulam Ac Duronto Express reach on day 2 to Ernakulam Junction (South). The arrival time of Mumbai LTT Ernakulam Ac Duronto Express at Ernakulam Junction (South) is 20:15.
Mumbai LTT Ernakulam Ac Duronto Express covers 1459 km to reach Ernakulam Junction (South). Mumbai LTT Ernakulam Ac Duronto Express passes through 6 stations.
Travel Time: 23h 25m    4 halts    Distance: 1293 km    Avg Speed: 55 km/hr.
Type: Duronto
Rake Zone: CR/Central.
4 halts. 180 intermediate Stations between Lokmanya Tilak Terminus and Ernakulam Junction (South).
Monsoon Time Table will come into effect from 10th June, 2018 upto 31st Oct,2018.
Inaugural Run
Tue Jan 18, 2011.
RSA - Rake Sharing
No RSA.
Loco
LTT - ERS
KYN/WDP-3A OR KYN/WDM3D.
LHB Rake
Rake/Coach Position
  0  L  1EOG  2 B8  3 B7  4 B6  5 B5  6 B4  7 B3  8 B2  9 B1 10 PC 11 H1 12 A2 13 A1 14EOG.

Barkur railway station is a station on Konkan Railway. It is at a distance of 675.572 km (419.8 mi) down from origin. The preceding station on the line is Kundapura railway station and the next station is Udupi railway station.

More from this channel