TRRS 393: CSX Yarding a Coal Train @ Consumers Power
1,249 views · Published 20 September 2014 · 15:19 · Indexed 14 November 2026
Channel: Thornapple River Rail Series · 2014 · Autos & Vehicles
CSX's N910 rolls through Port Sheldon, Michigan, nearing the end of a 2,000 mile odyssey across much of the US from the Powder River Basin to Consumers Energy's Campbell Generating Plant on the banks of Lake Michigan. With the headend N910 crew low on time, D801, who brought down the helper power, took over the headend at Wells while the N910 took over the pusher power. After the D801 engineer eases the train to a stop on the two-mile Consumers Power Spur, the N910 crew detrains from their power at the end of the ~7500 foot train. The D801 crew uncouples the headend power and takes it into the yard. Sometime later, with the D801 engineer taken to the helper power, the conductor returns to the west end to protect the shove and work the yarding process. It take two of Campbell's Receiving/Departure tracks to hold a standard 130-car train. The rain is no issue as the crew works through the drizzle to get the job done. The crew went on afterwards to build an eastern train and take it to Grand Rapids, making for a long day (and night) in the rain. Consist: - BNSF 9933 [SD70MAC] - BNSF 9374 [SD70ACe] - 130 cars [Loaded Coal Gons] - BNSF 9347 [SD70ACe] - BNSF 9205 [SD70ACe] Location/Time: - CSX Fremont Sub, Port Sheldon, MI, Van Buren Rd xing, on 9-12-14 at 17:10 EDT - CSX Fremont Sub, Consumers Power Spur, Hiawatha St xing, at 17:55 EDT [Headend power] - CSX Fremont Sub, Consumers Power Spur, Hiawatha St xing, from 18:45 to 19:25 EDT [Rear end and train] *N910 original headend, traded to rear at Wells short on time, with D801 on the headend. At plant, D801 takes headend power to the Wye was N910 detrains and leaves. D801 returns and yards the train via shoving into the yard* Thanks for watching! Don’t forget to share this video, like and subscribe to Thornapple River Rail Series! Copyright 2014 Thornapple River Rail Series
More from this channel
-
1:26
TRRS 10: Porter Junction: NS Westbound Intermodal
-
2:30
TRRS 11: Porter Junction:CP mixed with BN, BNSF power
-
2:17
TRRS 12: Porter Junction: NS Westbound Intermodal
-
1:22
TRRS 15: Porter Junction: NS Westbound Intermodal
-
2:20
TRRS 22: Porter Junction: CP Westbound Mixed
-
1:48
TRRS 28: Wyoming Yard Work, 5-7-11.
-
5:59
TRRS 29: LSRC 1169 & 801 @ Campbell St.
-
3:37
TRRS 30: LSRC 1169 & 801 @ Werth Rd.