TRRS 165: Amtrak #370 Pere Marquette & CSX Coal Train E945, in Hudsonville, MI

708 views · Published 4 February 2013 · 6:31 · Indexed 31 October 2026

Channel: Thornapple River Rail Series · 2013 · Autos & Vehicles

Watch on YouTube

2 trains, 1 place, lots of problems! Featured is Amtrak being late due to hitting debris, slowing for a crossing activation, and losing air. E945 caused the crossing issues. Read the following for the full story!

So grandma just got to town from Phoenix (carrying the below average temps with her), and E945 was getting ready to depart Wyoming, so we thought we'd run down and see them and Amtrak. It's safe to say we got a lot more. 

Well, we missed E945 in Grandville by about 5 minutes, so we went west to Hudsonville, where they'd be going in the hole for Amtrak. Passed a Port Sheldon Crossing that was still activated, with the train maybe 20 cars clear. Got to the East End, setup and began to wait. Scanner crackles with the RN reporting that 370 hit an obstruction near Fennville. Report is that it was metal, and the crew was out doing an inspection. This at 20:40. 

Then, the RN calls for E945 to ask about a report of a crossing malfunction at Port Sheldon. Report from the local police is that the crossing gate is broken. E945 informs the RN that they are clear of the crossing, and nothing was wrong when they went by. This at 20:45 or so. 

At 20:50, while sorting out the crossing problem, the RN informs E945 that P370 has their air back, pulling by New Richmond at 20:50. 

By 21:04, Maintainers at the scene at Port Sheldon. RN gives P370 an EC-1 for the broken detector at Zeeland and the Port Sheldon crossing at the same time. P370 is at Saugatuck.

At 21:19, E945 pulls forward to enter the siding at Hudsonville. BNSF 9483 Leading, 6381 Trail with the usual empties. Has a red-over-yellow-over-red at E/E Hudsonville. 

At 21:30, E945 has cleared the E/E switch. 

At 21:40, P370 clears E/E Hudsonville. 17 leading 3 supers and 90368. [Phase 3 Cabbage]. RN calls to anull their EC-1 for the crossing failure at Port Sheldon, but the Conductor is in the train, un-reachable by radio. Because maintainers are still on the scene, the engineer elects to slow to 15 instead of cancelling the EC-1, which would not be done until the train was already by. 

At 21:46, P370 has cleared the Port Sheldon crossing, accelerating back up, or so he thought. By 21:47, he's ringing his conductor because his air pressure isn't coming back. He calls the RN, reports that "they'll stop where they stop". Air was in the 104 area then it should be at 130. 

By 21:48, they're at the signal at MP 9, he calls it, and starts blowing for 12th Ave, then calls back the RN to report he's got his air back, and they'll be proceeding as usual. 

But that didn't last long, because by 21:49 they were having issues again. Engineer talking with conductor and RN, saying they've got a "pop-off" valve on the leader leaking. Plans on stopping at Milepost 8 or so to check it out. 

At 21:50, the problem has again ceased, now at MP 8, so he reports. 

At 21:51, brakes acting up again. Gonna stop at Milepost 7 (Under 196) to "catch it in the act". Train stops, we went to Grandville. After a couple of minutes, he reports they seem to has the issue fixed, heading east. 

At 21:57, P370 cleared Grandville. No problems reported as of them getting to Lamar.


1. CSX Coal Train E945 
Consist:
- BNSF 9483 [SD70MAC]
- BNSF 6381 [ES44AC]
- 130 cars [Empty Coal Gons]
Location/Time:
- CSX Grand Rapids Sub, Hudsonville, MI, 32nd Ave xing/ East End Hudsonville Siding, on 1-20-13 at 21:19 EST

2. Amtrak Pere Marquette #370
Consist:
- AMTK 17 [P42]
- 3 cars [Superliners]
- AMTK 90368 [NPCU/Cabbage] **Phase III Paint***
Location/Time:
- CSX Grand Rapids Sub, Hudsonville, MI, 32nd Ave xing/ East End Hudsonville Siding on 1-20-13 at 21:40 EST
- CSX Grand Rapids Sub, Grandville, MI, Wilson Ave xing/CP Grandville, on 1-20-13 at 21:59 EST

More from this channel