Fitchburg: Burbank Hospital Expansion Project (Part 7)
159 views · Published 9 January 2013 · 2:04 · Indexed 18 October 2026
Channel: georgef551 · 2013 · Science & Technology
Recorded January 8, 2012 Literally nothing too noticeable over a 6 month span, other than the parking lot was paved (covered in snow), New parking lot lights were also installed. The fence surrounding the building is gone. The back looks the same, nothing new. A bridge to span the back parking lot, to the elevated rear door, still not installed. The bridge was rescued from the burned-out Johnsonia Building, bridging it, to the Putnam Street Parking Garage. We also see what the back looks like. Rumor Mill is that this should be done this Spring, and that will be the next, and last construction video here. Depending how the building is laid out, depends if any elevator/general recording will be done here (HIPPA issues). Hopefully I'll get the elevator(s?) when it's done.
More from this channel
-
9:34
Leominster: Abandoned Granite Quarry, Part 2 of 3
-
3:28
Leominster: House on the Freeway
-
3:57
Leominster: Man-Powered Elevators @ Parking Garage
-
5:34
Leominster: EPIC FAIL in Archetectural Asthetics
-
4:00
Littleton: A Lap Around the (Industrial) Park
-
2:15
Leominster: New Water Treatment Plant (Part 1)
-
1:46
Worcester: Korean War Memorial
-
0:25
Re: President Obama - Your Turn: Join the National Online Discussion on Health Care Reform